驸马长江大桥无吊索加劲梁安装技术 被引量:1

No-suspender-cable Stiffening Girder Installation Technology in Fuma Yangtze River Bridge
下载PDF
导出
摘要 悬索桥无吊索区梁段的安装是悬索桥上部结构安装施工过程中的一个重大技术难题,目前常用的施工方法是支架法或托架法临时固定,也有采用加工临时索夹加吊索进行端梁的临时固定。本文以驸马长江大桥无吊索梁段施工为例,采用在主塔上设置吊点,再加上斜吊索的临时固定,为无吊索梁段的临时固定提供了新的思路。 Installation of no-suspender-cable girder in suspension bridge is very difficult during upper structure installation of suspension bridge. The normal construction method is bracket method for temporary fixation, and also temporary cable holder and hanger cable are used for temporary fixation of end girder. For the no-suspender-cable stiffening girder of Fuma Yangtze River Bridge as an example, the construction method of setting hanging point in main tower and inclined hanging cable for temporary fixation is used which gives a new thought for temporary fixation of no-suspender-cable girder construction.
出处 《施工技术》 CAS 北大核心 2017年第22期30-32,88,共4页 Construction Technology
基金 中交一公局第三工程有限公司科研课题:跨长江千米级悬索桥钢箱梁施工与安全技术研究(KT2015-3)
关键词 桥梁工程 加劲梁 斜吊索 临时固定 安装 bridges stiffening girder inclined hanging cable temporary fixation installation
  • 相关文献

参考文献4

二级参考文献9

共引文献33

同被引文献5

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部