摘要
通过对现阶段施工单位面临的营改增相关问题进行分析,总结各问题原因,给出了相关的可行性建议,为其他企业提供参考借鉴。
Analyzes the problems related to the increase of the camps faced by the construction units at this stage, summarizes the causes of the problems, gives the relevant feasibility suggestions, and provides reference for other enterprises.
出处
《建筑技术开发》
2017年第11期53-54,共2页
Building Technology Development
关键词
营改增
建筑施工
造价人员
battalion increase
construction
cost personnel