4Brena A S F, Bonczar C H, Civjan S A, et al. Evaluation of seasonal and yearly behavior of an integral abutment bridge [ J ]. Journal of Bridge Engineering, 2007,12 ( 3 ) : 296 -305.
5Haj-Najib R. Integral abutment bridges with skew angles [ D ]. Maryland: Unive~ity of Maryland, 2002.
6Huang J, Shield C K, French C E W. Parametric study of concrete integral abutment bridges [ J ]. Journal of Bridge Engineering, 2008,13 ( 5 ) : 511-526.
7Jin X, Shao X, Peng W, et al. A new category of semi- integral abutment in China [ J ]. Structural engineering international, 2005,15 ( 3 ) : 186-188.
8Tlustochowicz G. Optimized design of integral abutments for a three span composite bridge [ D ]. Lulea: Lulea University of Technology,2005.
9Dejong J T, Howey D S, Civjan S A, et al. Influence of daily and annual thermal variations on integral abutment bridge performance [ C l//Geotechnical Engineering For Transportation Projects, ASCE, 2004 ( 126 ) :496-505.
10Thippeswamy H K, Gangarao H V S, Franco J M. Performance evaluation of jointless bridges [ J ]. Journal of Bridge Engineering, 2002,7 (5) :276-289.