大唐鲁北发电厂空预器堵塞原因分析及对策

Cause Analysis and Countermeasures of Air Preheater Blockage in Datang Lubei Power Plant
下载PDF
导出
摘要 大唐鲁北发电厂2台330MW机组采用SCR脱硝装置、三分仓回转式空气预热器。在运行过程中,空预器出现较严重的堵塞现象,引起风烟系统多种缺陷,严重时影响机组出力。本文分析了空预器堵塞的原因,并结合原因分析给出了解决方案。由于SCR脱硝系统在国内广泛应用,本文对同类型的问题有一定参考价值。 Datang Lubei Power Generation Co. Ltd has2 × 330 MW units with SCR denitration device, three sectional regenerative air-preheater. During the operating process, the air pre-heater appeas serious plugging phenomena, which causing various defects of flue gas system and seriously affecting the unit's output. This paper analyzes the reasons of air preheater clogging, and gives the solution based on the analysis of the reason. Because the SCR denitrification system is widely used in China, this paper has a certain reference value to the same type of problems.
作者 周月旭
出处 《科技视界》 2017年第25期142-143,120,共3页 Science & Technology Vision
关键词 燃煤机组 空预器 SCR脱硝 堵塞 Coal fired unit Air - preheater SCR denitration Plugging phenomena
  • 相关文献

参考文献2

二级参考文献9

共引文献42

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部