期刊文献+

长螺旋钻孔压灌桩在机场交通中心工程中的应用 被引量:6

Long Auger Drilling and Pressure-Grouting Pile Applied to Airport Traffic Center Engineering
下载PDF
导出
摘要 上海虹桥国际机场T1航站楼交通中心工程位于软土地区,且周边环境复杂、文明施工要求高。为减小基坑工程施工过程对周边环境的影响,尝试采用了长螺旋钻孔压灌桩作为基坑围护,收到了理想的效果。介绍了长螺旋钻孔压灌桩施工工艺要点,并与钻孔灌注桩进行了优缺点对比,总结的经验可供类似项目参考。 Shanghai Hongqiao International Airport T1 terminal traffic center project is located in the soft soil area, with complex surrounding environment and high requirements of civilized construction. In order to reduce the impact of the foundation pit construction process on the surrounding environment, the long auger drilling and pressure-grouting piles have been used as foundation pit support and achieved ideal effects. The key points of the construction process of the long auger drilling and pressure-grouting piles have been introduced in this paper. Compared with the advantages and disadvantages of the bored piles, the summarized experience can provide references for similar projects.
出处 《建筑施工》 2017年第11期1591-1593,共3页 Building Construction
关键词 长螺旋钻孔压灌桩 基坑围护 后插钢筋笼 振捣 long auger drilling and pressure-grouting pile foundation pit support post-inserted steel reinforcement cage vibration
  • 相关文献

参考文献8

二级参考文献32

  • 1杨永霞,高谦.长螺旋钻机成孔压灌砼桩后插钢筋笼施工工艺及配套装置的应用[J].岩土工程技术,2004,18(6):279-281. 被引量:6
  • 2JGJ94-2008建筑桩基技术规范[S].中国建筑工业出版社.2008.
  • 3何庆林.超流态混凝土及其成桩方法和该方法所用的钻机.ZL93120168.3.1993.12-13.
  • 4建设部.(1996-2010)中国建筑技术政策[C].北京:中国城市出版社,1998.
  • 5李式仁,徐士亮.振捣插筋钻孔压灌桩在济南地区的应用初探[C].山东省建筑学会结构专业委员会2006年学术交流会论文集.2006.
  • 6陈富生,等.太原第一热电厂Ⅵ期扩建工程试桩工程总报告[R].
  • 7李佳.混凝土桩插筋方法及其筋材.ZL99114348.5.1999.07.29.
  • 8GB/T14902-2008.预拌混凝土[S].
  • 9陈德文,李式仁.振捣插筋钻孔压灌桩工艺技术及设计应用[C].北京:中国环境出版社.2006.
  • 10GB50154-1992.混凝土质量控制标准[S].

共引文献51