济南轨道交通R1线弱电系统不间断电源建设方案探讨 被引量:10

Construction of Weak Electricity System UPS for Ji'nan Rail Transit R1 Line
下载PDF
导出
摘要 介绍了济南市轨道交通R1线的工程概况及建设原则,详细阐述了R1线不间断电源(UPS)建设方案,着重论述了供电方式及UPS整合方案的比选。R1线一级负荷中的特别重要负荷不整合,采用UPS分散供电方式;将ISCS(综合监控)、ACS(门禁系统)、AFC(自动售检票)、OA(协同办公)与PIS(乘客信息系统)等专业的设备进行整合,共用1套UPS;BAS(环境与设备监控系统)独立设置UPS,其设备与电源设置在ISCS设备机房。整合的负荷UPS采用双机并联冗余供电方式。计算了R1线采用UPS整合方案后的UPS容量及造价,以及机房建筑面积,计算结果显示,R1线UPS建设方案提高了供电的安全性和可靠性。 The current engineering of Ji'nan rail transit R1 Line and the construction principle are introduced,the weak electricity system UPS is specially described with a comparison between the power supply system and the integration with UPS. By adopting UPS,ISCS (integrated supervisory control system),ACS (access control system), AFC (automatic fare collection),OA (office automation) and PIS (passenger information system) could all be integrated. The capacity and cost of UPS after integration for R1 Line and the computer room area are calculated, it shows that the construction of weak electricity system UPS can improve the security and stability of R1 Line.
出处 《城市轨道交通研究》 北大核心 2017年第12期108-112,共5页 Urban Mass Transit
关键词 城市轨道交通 不间断电源 弱电系统 分散供 综合系统供电 rail transit uninterrupted power system (UPS) weak electricity system decentralized power supply integrated system power supply
  • 相关文献

参考文献3

二级参考文献2

  • 1GB50157-2003.地铁设计规范[S].[S].,..
  • 2JGJ 16-2008 民用建筑电气设计规范[S].

共引文献3

同被引文献55

引证文献10

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部