高覆土工况下大口径PCCP输水管道施工 被引量:1

Construction of large diameter PCCP water pipeline with thick earth-covered
下载PDF
导出
摘要 辽宁省重点输水工程输水管线大部分采用了大口径PCCP,管道的最大设计覆土厚度为8 m。文章总结了在PCCP管道不同铺设形式下当管顶覆土厚度大于8 m时的技术与施工解决方案。工程实践表明,该方案保证了高覆土下PCCP管道的安全,节省了工期与工程成本。 The large diameter PCCP is adopted for the most of pipeline in the important water conveyance project of Liaoning Province. The maximum design thickness of earth-covered is 8 m. The paper summarizes the solution schemes of technique and construction for PCCP under different laying forms with the thickness of the earth-covered above the pipe top as more than 8 m.The engineering practice shows that the scheme could ensure the safety of the PCCP under thick earth-covered, shorten the construction period and save the cost.
作者 郭放
出处 《东北水利水电》 2017年第12期17-18,共2页 Water Resources & Hydropower of Northeast China
关键词 PCCP 深埋混凝土基座 高覆土 技术方案 大口径 PCCP deep buried concrete base thick earth-covered technique scheme large diameter
  • 相关文献

参考文献5

二级参考文献14

共引文献15

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部