结合SPM软件的数据流,论述EPC总承包项目中材料控制的主要流程和重点环节。包括设计数据、请购数据、订单数据、现场入库、现场预测、预留数据、现场材料发放、库房材料盘库数据、设计变更、过量、移库、退库、剩余材料数据、材料周报、月报和材料结算数据在内的总承包项目中相关材料控制工作的侧重点。
Combined with the data flow of SPM software,this paper discusses the main processes and key links of material control in EPC general contract project. Including design data,purchase data,order data,on-site storage,on-site forecasting, reservation data, on-site material issuance,warehouse material inventory data,design changes,excess,transfer,return to stock, residual material data, monthly report and weekly report of materials, and material settlement data, including priorities of the material control of the general contracting project.
出处
《化工设计》
CAS
2017年第6期47-49,共3页
Chemical Engineering Design
关键词
材料控制
SPM软件
总承包项目
material control
SPM software
general contract project