摘要
循环流化床锅炉在我国正在得到越来越广泛的发展,循环流化床锅炉机组的启动调试工作是机组投入商业运行的必要程序,对循环流化床机组基建调试过程中遇到的问题详细阐述,分析结果可为循环流化床机组安全稳定运行提供参考。
Circulating fluidized bed boiler is more and more widely in the development of our country. CFB unit adjustment test commissioning is a necessary procedure into commercial operation, the problems encountered in the construction process of circulating fluidized bed units are described in detail, the results can provide reference for the safe and stable operation of circulating fluidized bed unit.
出处
《电站系统工程》
2017年第6期41-42,46,共3页
Power System Engineering
关键词
循环流化床
基建调试
膨胀节烧损
circulating fluidized bed
infrastructure commissioning
expansion joint burning