期刊文献+

工程供应链环境下带有价格折扣的两种材料库存模型构建与求解

Construction and Solution of Two Kinds of Material Inventory Models with Price Discount in Engineering Supply Chain Environment
下载PDF
导出
摘要 以工程供应链中库存成本最小化为优化目标,考虑含有两种材料的价格折扣模型,构建了库存优化模型。通过Matlab中的遗传算法工具箱求解该模型,实现了库存控制的最优化问题。最后,通过一个数值算例证明了该模型的算法选用的合理性和可行性。 In this paper, we minimize the inventory cost in the engineering supply chain as the optimization target, consider the price discount model with two kinds of materials, and build the inventory optimization model. We solved the model through the genetic algorithm toolbox in matlab, and realized the optimization problem of inventory control. Finally, we prove the rationality and feasibility of the algorithm selection by a numerical example.
出处 《物流科技》 2017年第12期21-24,共4页 Logistics Sci-Tech
关键词 供应链 两种材料 价格折扣 库存优化 遗传算法 supply chain two kinds of materials price discount inventory optimization Genetic algorithm
  • 相关文献

参考文献1

二级参考文献59

  • 1Smith- Daniels D E, Smith- Daniels V L. Op6mal project scheduling with materials ordering [ J]. lie Transaefions, 1987, 19 (4): 122-129.
  • 2Dedin B, glimam A A. Integrated project scheduling and material planning with variable activity duration and rewards [J]. IIE Transactions, 2001, 33 (11): 1005- 1018.
  • 3Bresnen M, Marshall N. Partnering in construction: a critical xeview of issues, problems and dilenmms [ J]. Constr Manag Econ, 2000, 18 (2) : 819 - 832.
  • 4Saad, M., Jones, M., and James, P., A review of the progress towards the adoption of supply chain management (SCM) relationships in construction [ J ]. European Journal d Purchasing and Supply Management, 2002, 8 (3): 173- 183.
  • 5Williamson, Oliver E. The Mechanism of Governance [M]. New York: Oxford Univ. Press, 1995.
  • 6Jeffrey H.Dyer, Harbir Sinsh, The relational view: cooperative strategy and sources of interorganzational competitive advantage[ J]. Acedemy of Management Review, 1998, 23 (4) : 660 - 679.
  • 7Bennett, J., Jayes, S. The Seven Pillars of Partner- h~g: a guide to partnering in construciton [ M]. Thomas TelfordPublishing, London, 1998.
  • 8Anumba, C.J., Siemieniueh, C.E., Sinclair, M.A. supply chain in.cations of concurrent engineering [J]. Imrna- fional. Journal of Physical Distrilmfion and Logistics Mangement, 2000, 30 (7-8): 566-597.
  • 9Ander Errasti, Roger Beach, Aitor Oyarbide, JavierSantos. A process for developing partnendlips with subcontractorsh, the construction industry: An empirical study [ J], Interrna-tional Journal ofProject Management, 2(K17, 25 (3): 250-256.
  • 10Akintola Akintoye, George McIntosh, Eamon Fitrger-aid. A survey of supply chain collaboration and management inthe U K construction industry [J]. European Journal of Purchasing Supply Management, 2000, 3 - 4 (6) : 159 - 168.

共引文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部