摘要
介绍了某铁路尼尔森体系系杆拱桥施工监控情况,包括监控方案、成桥索力调整、监控结果,对尼尔森体系拱桥施工监控提出了建议,解决了尼尔森体系拱桥成桥索力调整的问题。
The article introduces construction monitoring of Nielsen arc bridge in railway, including monitoring solution, adjust finished-stage ca-ble force, the monitoring results. Finally puts forward some suggestions for construction monitoring of Nielsen arch bridge, solved the cable force adjustment problems of Nielsen arch bridge.
出处
《山西建筑》
2017年第34期169-170,共2页
Shanxi Architecture
关键词
尼尔森拱桥
施工监控
测点布置
Nelson arch bridge, construction monitoring, point layout