期刊文献+

JIT采购方式对供应链的碳排放影响 被引量:4

The Effect of JIT Purchasing on Carbon Emissions in Supply Chain
原文传递
导出
摘要 零售商选择经济订购批量(EOQ)还是准时制(JIT)采购方式受到各种成本因素影响。在碳税政策下,以单供应商-单零售商组成的供应链系统作为研究对象,构建了供应链EOQ-JIT成本差异函数和EOQ-JIT碳排放差异函数,并对其解进行分析。最后利用数值分析,发现当供应商的年生产量较小时,零售商易于选择JIT采购方式,且供应链的碳排放比采取EOQ采购方式低;降低JIT采购方式的运输成本和运输产生的碳排放是实施JIT采购和降低供应链的碳排放的关键。 Whether to adopt EOQ or JIT purchasing, a retailer is affected by a variety of cost factors. Taking the supply chain which consists of single supplier and single retailer as research objective under the carbon tax policy, EOQ-JIT different cost function and EOQ-JIT different carbon emissions function were constructed and the solution was analyzed. Finally, the numerical analysis shows that the retailer inclines to choose JIT, and carbon emissions are less when the supplier's annual production capacity is small. Reducing costs and carbon emissions in transportation are the keys to implement JIT purchasing and reducing carbon emissions in supply chain.
出处 《工业工程与管理》 CSSCI 北大核心 2017年第6期99-106,共8页 Industrial Engineering and Management
基金 国家自然科学基金资助项目(71401082) 教育部人文社会科学基金资助项目(14YJC630009) 江苏省普通高校研究生科研创新计划资助项目(KYLX16_0873)
关键词 碳税 准时制 经济订购批量 碳排放 carbon tax JIT EOQ carbon emissions
  • 相关文献

参考文献3

二级参考文献30

  • 1杜战其.基于JIT的生产计划与控制方法研究[J].科技情报开发与经济,2005,15(19):134-136. 被引量:6
  • 2杜战其.看板管理在JIT生产中的应用分析[J].科技情报开发与经济,2005,15(20):210-212. 被引量:10
  • 3浦徐进,梁梁,凌六一.基于两层供应链的JIT策略和VMI策略的对比研究[J].南开管理评论,2006,9(3):98-102. 被引量:11
  • 4运筹学编写组.运筹学[M].北京:清华大学出版社,2007年版.
  • 5Farzaneh Fazel, Klaus P Fischer, Gilbert Erika W. JIT purchasing vs. EOQ with a price discount: An analytical comparison of inventory costs[J]. Int J Production Economics, 1998,54 : 101-109.
  • 6Marc J. Schniederjans, Qing Cao, A note on JIT pur chasing vs. EOQ with a price discount: An expansior of inventory costs[J]. Int J Production Economics, 2000,65: 289-294.
  • 7Qing Cao, Schniederjans, Marc J. A revised EMQ/JIT production-run model: An examination of inventory and production costs[J]. Int J Production Economics, 2004,87:83-95.
  • 8Wu Min, Low Sui Pheng. Modeling just-in-time purchasing in the ready mixed concrete industryl[J]. Int J Production Economics, 2007, 107 : 190-201.
  • 9Chyr F, Lin TM, Ho CF. Comparison between just - in - time and EOQ system [J]. Engineering Costs and Production Economics, 1990, 18(3), 233-240.
  • 10Grant MR. EOQ and price break analysis in a JIT environment [ J l. Production and Inventory Management Journal, 1993, 34(3) , 64 -68.

共引文献15

同被引文献41

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部