基于AHP的城市滨河路施工风险评价研究 被引量:1

Study on Risk Evaluation of Urban Riverside Road Construction Based on AHP
下载PDF
导出
摘要 城市滨河路工程项目具有建设周期长、施工环境复杂、工程参与方多以及对社会环境影响大等特点,涉及的风险因素较多。为了能够有效地进行城市滨河路项目的风险评价,从进度风险、质量风险、成本风险和安全风险四个方面建立了滨河路工程项目施工阶段风险评价指标体系,采用层次分析法(AHP)对某一具体工程项目进行了风险评价。结果表明,建立的评价指标体系和层次分析法可以有效地进行滨河路工程项目施工风险评价。 The urban riverside road engineering project has the characteristics of long construction period,complex construction environment, many engineering participants and large social environment influence,and has more risk factors. Able to effectively carry out the risk evaluation of urban riverside road projects,the risk evaluation index system of riverside road engineering construction period is established from four aspects of schedule risk, quality risk, cost risk and safety risk. The analytic hierarchy process(AHP) is used to carry out the risk evaluation of an engineering project. The result shows that the established evaluation index system and AHP can effectively carry out the risk evaluation of riverside road engineering construction.
出处 《城市道桥与防洪》 2017年第12期99-101,116,共4页 Urban Roads Bridges & Flood Control
基金 辽宁省教育厅科研基金项目(JW201615406) 辽宁工业大学教师科研启动基金项目(X201406)
关键词 滨河路 AHP 施工 风险评价 riverside road AHP construction risk evaluation
  • 相关文献

参考文献5

二级参考文献50

共引文献85

同被引文献4

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部