摘要
在隧道工程施工过程中采用超前地质预报,能够有效避免在隧道工程施工中遇到不良地质,保证施工安全。对此,文章首先对TSP基本原理进行了介绍,然后对结合工程实例对TSP超前地质预报在隧道施工中的应用方式以及异常信号避免方式进行详细探究,以期为类似工程提供借鉴。
The use of advanced geological prediction in the process of tunnel construction can effectively avoid the adversegeological conditions encountered in the tunnel construction and ensure the construction safety. In this regard, the articlefirst introduces the basic principles of TSP,and then discusses the application of TSP advanced geological prediction in tunnelconstruction and the way to avoid abnormal signals in order to provide reference for similar projects.
出处
《交通节能与环保》
2017年第6期94-96,共3页
Transport Energy Conservation & Environmental Protection
关键词
隧道工程
TSP探测
超前钻探法
地质预报
tunnel engineering
TSP detection
advanced drilling method
geological prediction