大口径雨水顶管连续穿越障碍物的工程设计 被引量:4

Design of Large Diameter Rain Pipe Jacking for Continuous Crossing Obstacles
原文传递
导出
摘要 无锡市亭子桥雨水泵站DN2 400大口径雨水管总长度为435 m,顶管施工,路径穿越繁华的市中心,管道经过现状d5 500雨水井、运行中的地铁、市政检查井、现状污水管、已填埋古河道、高楼地下室、运行中的泵站、桥梁基础、现状河道、泵站进水井等11处重要设施。结合施工方案进行管道选型并提高技术要求,详细调查各节点的现状基础资料,组织专项论证会对设计施工风险进行评估并制定应急预案,对各穿越节点进行了精心设计、谨慎施工、严格监测。 The total length of DN2 400 large diameter rain pipe was 435 m, which is constructed with pipe jacking technology. The pipe path crosses the busy downtown area. The pipe is closely related with eleven important municipal facilities including the current rainwater well with a diameter of 5 500 ram, running subway, municipal inspection wells, existing sewage pipes, covered paleo-river, basements of high-buildings, pump station in operation, bridge foundation, present river, pumping well and so on. After several steps were finished as follows : selection of pipe type on basis of the construction plan, im- provement of the technical requirements, careful investigation of the basic data of each node, special demonstration was organized to assess the risk of design and construction, and to make emergency re- sponse plans. In the whole process, each of the nodes was required to be well-designed, carefully con- structed and strictly monitored.
出处 《中国给水排水》 CAS CSCD 北大核心 2017年第24期71-73,77,共4页 China Water & Wastewater
关键词 大口径雨水管 顶管施工 穿越障碍物 large diameter rain pipe pipe jacking crossing obstacles
  • 相关文献

参考文献1

二级参考文献3

共引文献1

同被引文献15

引证文献4

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部