一次采全高综采采煤工艺及设备研究 被引量:5

A Study on the Technology and Equipment of Full Seam Mining
下载PDF
导出
摘要 付村煤矿3_上1007工作面平均厚度为5.5m,煤层倾角较小,采用走向长壁后退式一次采全高综合机械化采煤法,全部垮落法管理顶板。工作面投产后,采煤工艺与配套设备运行良好,达到了预期生产目标,经济效益显著。 The coal average thickness of 1007 working face of Fucun Coal Mine is 5.5m, and the coal seam dip Angle is small. Adopting the full seam comprehensive mechanized coal mining method,with the retreating-longwall characteristic,adopting all caving managing method. After the working face is put into operation, the coal mining technology and supporting equipment are in good operation, and the economic benefts are remarkable, achieving the expected production target. The paper mainly discussed what mentioned above.
作者 张阳 郭莹
出处 《山东煤炭科技》 2017年第12期16-17,20,共3页 Shandong Coal Science and Technology
关键词 全高 综采 工艺 设备 whole full high mechanized technology equipment
  • 相关文献

参考文献2

二级参考文献5

  • 1中国矿业学院.采煤学[M].北京:煤炭工业出版社,1979..
  • 2魏同.煤矿总工程师工作指南[M].北京:煤炭工业出版社,1988.
  • 3刘富,等.煤矿开采方法[M].北京:煤炭工业出版社,2004.
  • 4张荣立,何国纬,李铎,等.煤矿工程设计手册[M].北京:煤炭工业出版社,2003.
  • 5王焱金,李文德,任葆锐,屈国华.履带式行走液压支架在短壁式开采中的应用[J].煤,2001,10(6):30-31. 被引量:8

共引文献14

同被引文献20

引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部