期刊文献+

胡底煤业底抽巷穿层钻孔抽采效果研究 被引量:4

Investigation on Extraction Effect of Cross Drainage Drilling Holes in Bed Plate Tunnel in Hudi Coal Mine
下载PDF
导出
摘要 胡底煤业前期采用顶板岩巷布置下行穿层钻孔对煤巷条带瓦斯进行预抽,存在钻孔成孔率低,抽采效果差的问题。因此在1303采面采用底抽巷布置上行穿层钻孔的方式,并从钻孔布置方式、施工工艺及封孔工艺方面进行了改进,抽采效果有了明显提高,单孔抽放浓度均在50%以上,抽采达标时间缩短,为矿井的安全生产提供了保障。 In the early stage of Hudi Coal Mine, the gas of coal roadway was pre-pumped by using roof rock roadway, which has low hole porosity and poor extraction effect. So at the bottom of 1303 mining face, cross drainage drilling is made use of , and the drilling arrangement, construction technology and hole sealing technology are improved. As a result, the extraction effect has increased signifcantly, puckering drainage concentration is over 50%, and the extraction standard time is shortened, which has provided safeguard for the mine safety production.
作者 张晓铭
出处 《山东煤炭科技》 2017年第12期86-87,90,共3页 Shandong Coal Science and Technology
关键词 突出矿井 底抽巷 穿层钻孔 封孔工艺 outburst mine bed plate tunnel cross drainage drilling holes sealing pore technique
  • 相关文献

参考文献5

二级参考文献39

共引文献26

同被引文献13

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部