本文通过对铁路穿越天然气管道的施工分析,采取有效的徒步的勘查交底方法,通过桥涵防护和电磁防护施工,采取明确的施工责任安排,高效完成新建铁路穿越天然气管道。
The walking exploration methods were taken by the analysis on the construction of the railway passing through natural gas pipelines. The new railway crossing natural gas pipelines gas been accomplished efficiently through the bridge and culvert protection and electromagnetic protection as well as the clear responsibility of construction arrangement.
出处
《石化技术》
CAS
2017年第12期6-7,共2页
Petrochemical Industry Technology
关键词
穿越
标识桩
桥涵
电磁防护
crossing
marked pile
bridge and culvert
electromagnetic protection