摘要 2013年4月23日,杏山铁矿-330m水平卸矿硐室北侧正对主溜井井筒中心方向墙部发生垮冒,与主溜井井筒塌透,造成矿石破碎提升流程停机。处理时先对冒入卸矿硐室内矿石进行灌浆稳固,清理出硐室侧壁;然后对硐室采用U25型钢拱架、耐磨板加钢筋混凝土的联合支护方式进行抢修加固,施工工期仅12d。经过组织专家论证和日常生产实际验证,卸矿硐室塌方部位处理方式合理,工期短,使用过程中安全稳定。 On April 23,2013,the wall was collapsed at the north of-330 mlevel ore dumping chamber of Xingshan iron ore mine towards the direction of the main chute wellbore center,and the main chute wellbore was collapsed,which caused ore crushing process downtime.The solution was to take grouting into ore dumping chamber indoor for solid,clearing the cavern wall.Then the U25 steel arch was used in the chamber,along with the combined supporting method of wear-resisting board plus reinforced concrete to repair and reinforce.The construction period was only 12 days.Through experts'argumentation and daily production validation,the solution to the landslide area of ore dumping chamber was reasonable with short construction period and stability in use process.
作者 郭晨 徐胜亮
出处 《中国矿业》 北大核心 2017年第12期171-174,183,共5页 China Mining Magazine
关键词 卸矿硐室 主溜井 垮冒 钢拱架 安全稳定 ore dumping chamber main ore pass catastrophic collapse steel arch security and stability
  • 相关文献

参考文献4

二级参考文献4

共引文献23

同被引文献8

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部