期刊文献+

浅析槽式光热发电工程建设及施工重点 被引量:1

Brief Analysis of Construction and Construction Points of Trough Type Photothermal Power Generation Engineering
下载PDF
导出
摘要 太阳能光热发电系统工作原理是先利用反射镜将太阳的直接辐射能聚集在吸热器上,加热吸热器中的吸热介质,将光能转化成热能,再利用吸热介质的热能通过蒸汽发生系统产生高温高压蒸汽,利用高温高压蒸汽通过汽轮发电机组实现热能到机械能再到电能的转换。论文仅浅要分析槽式光热发电项目在建设准备和施工阶段需关注的重点,以供参考。 The working principle of solar thermal power generation system is to use a mirror to gather the solar radiation on the heat absorber,then the solar radiation heats the heat medium in heat absorber, converts light energy into heat, then using the heat of heat medium to produce high temperature and high pressure steam by the steam generating system, using high temperature and high pressure steam to realize the conversion of thermal energy to mechanical energy to electrical energy by turbo generator. This article only briefly analyzes the points needs to be attention in the construction preparation stagy and construction stagy of tank photothermal power generation project, for reference.
作者 韦佳 段明爱
出处 《中小企业管理与科技》 2017年第35期172-173,共2页 Management & Technology of SME
关键词 光热发电 槽式 建设 施工重点 thermalpower generation trough construction construction priorities
  • 相关文献

参考文献1

二级参考文献23

共引文献7

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部