摘要
河北鑫泉石油化工有限公司50万t/a延迟焦化装置,借鉴国内外同行浮渣处理的成功经验,将污水处理过程中产生的浮渣进延迟焦化焦炭塔余热处理,装置运行结果表明,该处理工艺运行费用低,具有良好的社会效益和经济效益。
Hebei Xinquan Petrochemical Co.Ltd.500 thousand t/a delayed coking unit, learn from the successful experience of domestic and foreign counterparts of scum treatment, will be produced in the process of wastewater treatment into the dross in delayed coker heat treatment, the results showed that the treatment process of low operation cost, has good social and economic benefits.
出处
《化工设计通讯》
CAS
2017年第12期189-189,共1页
Chemical Engineering Design Communications
关键词
延迟焦化
浮渣
掺炼
焦炭
delayed coking
scum
blending
coke