摘要 以核电集团生产准备绩效指标体系为研究对象,收集分析了行业以及国内核电厂生产准备绩效指标体系架构,提出了核电集团生产准备绩效指标体系建设方案,包括主要原则、体系架构、指标设置、量化评价方法及应用。通过建立并实施生产准备绩效指标体系,核电集团可实现对所属核电厂生产准备工作的过程管理和量化评价。 With a view of establishing production readiness performance indicator system in a nuclear power corporation, the production readiness performance indicator system structure used in domestic nuclear power plants and in the industry was collected and analyzed. The approach of establishing production readiness performance indicator system was raised, including the principle, structure, main indicators, quantitative evaluation measures and applications. The nuclear power corporation will carry out the process management and quantitative evaluation for nuclear power plant production readiness management through the use of the performance indicator system.
作者 黄少青 王琳
出处 《能源研究与管理》 2017年第4期7-10,22,共5页 Energy Research and Management
关键词 核电集团 生产准备 绩效指标 体系 nuclear power corporation production readiness performance indicator system
  • 相关文献

参考文献1

二级参考文献4

  • 1Rober S. Kaplan and David P. Norton. Transforming the Balanced Scorecard from Performance Measurement to Strategic Management: Partl [J]. Accounting Horizons, 2001,15(1):87-104.
  • 2WANO. Guidelines for Performance Improvement at Nuclear Power Stations[M], 2011, 9.
  • 3顾延婷.电力企业业绩考核指标的建点方法[J],2009,4:66-68.
  • 4李风莲.平衡计分卡业绩评价系统的构建与应用研究[D].长沙:湖南大学硕士论文,2004.

共引文献1

同被引文献17

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部