摘要
在列控中心的现场实际应用中,分析列控中心与联锁间数据在安全数据网中因数据的传输路径存在不确定性,导致列控中心双系同一周期收到数据不一致的问题。并结合列控中心的系统结构,给出解决方案。
In the fi eld application of Train Control Center (TCC), the data between the TCC and the interlockingsystem is transmitted in the safety data network. Due to the uncertainty of the data transmission path, the datareceived by TCC dual systems in the same cycle will be inconsistent, so the results are different based on thesame logical operation under different inputs. Thus TCC will outputs commands only from main system with analarm from the standby system, and the switching between dual systems will be affected accordingly.
出处
《铁路通信信号工程技术》
2017年第6期15-17,共3页
Railway Signalling & Communication Engineering
关键词
列控中心
不同步
码序
Train Control Center
asynchrony
code sequence