期刊文献+

阳煤一矿3号煤层提升分运输系统的改造实践

Transformation Practice of No.3 Coal Lifting and Separating Transportation System in No.1 Coal Mine
下载PDF
导出
摘要 阳煤一矿为解决3号煤层提升及分运的难题,切实提高矿井运输和生产能力,通过在井底采取施工巷道、改造皮带运输系统等措施,实现了3号煤层的分装分运和独立运输,解放了主提升系统的运输能力,创造了巨大的经济效益,适应了阳煤一矿生产能力提升的的要求,为矿井的高产高效创造了条件。 In order to solve the problem of No. 3 coal mine hoisting and transport, and effectively improve the minetransportation and production capacity, by taking the construction of roadway, the transformation belt the transportsystem and other measures to achieve the No. 3 coal transport packaging and independent transport, the liberation ofthe main lifting system of transport capacity to create a huge economic benefits to the requirements of the mineproduction capacity, for the high yield and high efficiency to create conditions.
作者 王振帆
出处 《机械管理开发》 2017年第12期69-70,共2页 Mechanical Management and Development
关键词 分装分运 主提升 运输系统改造 separate transportation main hoisting transportation system reform
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部