针对阳煤一矿为了使大采高工作面安全快速通过地质构造,在83032工作面进行放炮、铺网、搭建平台、补打锚索和注浆的生产实践,主要对过构造前准备工作以及过构造施工方法进行了阐述,同时,进一步分别对放炮措施、施工组织措施、防片帮措施、工作面冒顶、片帮严重区域处理措施这几方面展开讨论并且总结。
In order to solve the large mining height working face crossing the geological structure, the shooting、thelapping、 platform built and grouting were put into practice, and mainly on the preparation work before and afterstructure construction method is discussed, at the same time, further on blasting measures, construction measures,defense help measures, working face roof fall, for the serious regional treatment measures in these areas are discussedand summarized, accumulated experience for promotion of construction technology of large mining height working faceof the.