摘要
山西省东山供水工程9号TBM隧洞施工在穿越不良地质洞段时突发泥石流。本文分析了原因,并总结了针对TBM突遇泥石流地质洞段所应采取的防治措施,以期为TBM安全、快速穿越提供借鉴。
Sudden debris flow broke out when crossing poor geological tunnel section during the constDongshan Water Supply Project No. 9 TBM Tunnel. In the paper, causes are analyzed, preventive measures adopted aiminat TBM during debris flows geological tunnel section are summarized. It is expected that the paper can the safe and fast crossing of TBM.
出处
《水利建设与管理》
2017年第12期6-8,5,共4页
Water Conservancy Construction and Management
关键词
TBM施工
泥石流
施工难点
应对措施
TBM construction
debris flow
construction difficulties
response measures