摘要
本文对福建万安溪水电站3号机底环安装中出现的问题进行分析、总结,并根据现场施工的实际情况,提出优化底环设计的方案。底环优化设计后,使安装工序简化并缩短了安装工期,且能够对底环水平、高程等进行有效控制。
In the paper, the problems in Fnjian Wan& anxi Hydropower Station No. 3 machine bottom ring installation are analyzed and summarized. A plan of optimizing the bottom ring design is proposed according to practical condition during site construction. The installation procedures are simplified, the construction term is shortened, the bottom ring level,elevation, etc. can be controlled effectively after bottom ring optimization design.
出处
《水利建设与管理》
2017年第12期39-40,97,共3页
Water Conservancy Construction and Management
关键词
底环
安装
优化设计
控制
bottom ring
installation
optimization design
control