期刊文献+

风电场的风资源评估及产能预估 被引量:10

Wind resource assessment and capacity estimation of wind farm
下载PDF
导出
摘要 以新疆某风电场每10 min的测风数据为基准进行风电场风资源评估;基于3种不同时间间隔(30min,1 h,2 h)的测风数据,并考虑尾流影响,利用Wind PRO软件对该风电场产能进行了评估;通过对比不同时间间隔测风数据的发电量误差,得出与该风电场风机发电特性最接近的测风时间间隔。文章阐述了风电场风资源评估的基本流程,利用先进的风资源评估软件,对进一步开发低风速风资源提供了有力的技术支持。该研究结果能够对精细化评估风电场产能及测风数据时间间隔的选取提供指导。 Based on the wind speed data(10 rain for each interval) of a wind farm in Xinjiang, the wind resource of the wind farm is assessed. Considering the influence of wake stream in three different intervals which are 30 min, 1 h, and 2 h respectively, capacity of the wind farm is estimated with the software named Wind PRO. By comparing generation error of different intervals, the optimal interval of wind speed measurement that can match the generation characteristics best is obtained. The basic technological process of wind farm wind resource assessment is expressed in this paper, combining with advanced wind resource assessment software, a strong technical support is provided for further development of low-speed wind resource. The study results can also provide some guidelines for refine estimation of wind farm capacity and selection of wind speed measurement interval.
作者 张雪芝 王维庆 王海云 Zhang Xuezhi;Wang Weiqing;Wang Haiyun(School of Electric Engineering, Xinjiang University, Engineering Research Center for Renewable Energy Generation and Grid Technology, Urumqi 830047, Chin)
出处 《可再生能源》 CAS 北大核心 2017年第12期1876-1880,共5页 Renewable Energy Resources
基金 国家自然科学基金项目(51667020) 新疆维吾尔自治区重点研发计划项目(2016B02019)
关键词 风电场 风资源 产能 wind farm wind resources capacity
  • 相关文献

参考文献5

二级参考文献22

共引文献14

同被引文献88

引证文献10

二级引证文献102

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部