期刊文献+

单元重载列车在三显示长大下坡道的技术方案

Technical Scheme of Heavy Haul Train Unit Running in Long Steep Grade Track with Three Aspect Automatic Block
下载PDF
导出
摘要 为彻底解决单元重载列车在自动闭塞三显示长大下坡道运行时,不能满足黄灯前控速和红灯前停车的安全隐患,通过在区间编码电路中增加L2、L3信息码,确保机车乘务员可以判断出列车运行前方至少4个闭塞分区的空闲情况,提高三显示区间重载列车通过能力。 To solve the issue that a heavy haul train unit running down a long steep grade under the control of a three-aspect automatic block cannot meet the requirements of controlling its speed before yellow light and stopping before red light,two codes of L2 and L3 are added into both the coding circuit for the station and that for the section down the long steep grade so as to assist the locomotive crew in judging whether at least four blocks in advance of the train are occupied or not.The addition of extra codes can enhance the carrying capacity for heavy haul trains of a section with three-aspect automatic block.
机构地区 神朔铁路分公司
出处 《铁道通信信号》 2017年第12期5-8,共4页 Railway Signalling & Communication
关键词 重载列车 三显示 长大下坡道 编码电路 技术方案 Heavy haul train Three-aspect automatic block Long steep grade Coding circuit Technical scheme
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部