许厂煤矿3336工作面煤层开采覆岩破坏并行电法监测研究

Study on the parallel electrical monitoring of overlying rock failure in coal seam mining in No.3336 working face of Xuchang Coal Mine
下载PDF
导出
摘要 在许厂煤矿3336工作面推进综放开采期间,由于覆岩破坏过程是随着采掘工作的推进而动态发育的,为保证工作面的安全开采,利用直流电并行电法对断层活化导水情况进行动态监测,通过并行电法CT成像监测技术进行实时监测覆岩破坏规律,随着工作面的不断推进,监测区内的岩体变形破坏阶段性明显,分析得出不同时期该煤层开采破坏后导水裂缝带高度范围为40.7~43.8 m。 During the fully mechanized caving mining in No.3336 working face of Xuchang Coal Mine,due to the destruction of overburden develops along with the mining,in order to ensure the safety mining of the working face,DC parallel electrical method is used to dynamically monitor the water conductivity of fault activation,the overburden failure rule is monitored in real time by parallel electrical CT imaging monitoring technology. With the working face advancing,the destruction of rock mass in the monitoring area is obvious,the analysis shows that after the destruction of coal seam mining in different periods,the height of water conducting fractured zone ranges from 40.7 to 43.8 m.
出处 《华北科技学院学报》 2017年第5期21-29,共9页 Journal of North China Institute of Science and Technology
基金 中央高校基本科研业务费资助(3142017036)
关键词 许厂煤矿 覆岩破坏 并行电法 断层活化 动态监测 导水裂隙带 Xuchang Coal Mine overburden failure parallel method fault activation dynamic monitoring water conducting fractured zone
  • 相关文献

参考文献8

二级参考文献48

共引文献133

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部