摘要
通过对水下混凝土灌注桩埋管产生原因的分析,找出预防事故的措施,提出了解决事故的数据及经验方法。
Through the analysis of the causes of the buried pipe of underwater concrete pouring pile, the measures to prevent the accident are found out, and the data and experience method for solving the accident are put forward.
出处
《西部探矿工程》
CAS
2018年第1期30-32,共3页
West-China Exploration Engineering
关键词
导管转不动
控制导管埋深
二次灌注
unable conduit rotating
control of buried depth of catheter
secondary perfusion