期刊文献+

一种预应力监测系统的现场应用研究 被引量:1

Research on Pre-stressed Concrete Monitoring System's Field application
下载PDF
导出
摘要 本文以重庆西站东站房预应力混凝土结构为工程背景,对预应力结构的长期监测方法进行了研究。采用的方法为,通过锚索计监测预应力钢筋的内力变化,利用钢筋计和混凝土表面应变计测量普通钢筋应力和混凝土的表面应变,通过静力水准仪监测预应力混凝土梁的竖向变形——挠度。通过分析现场量测结果发现,本文方法可实时监测预应力混凝土梁的安全状态,了解梁的健康状况。 Based on the pre-stressed concrete structure of Chongqing West Railway Station's eastbuilding, this thesis makes research on the long term monitoring method to pre-stressed structure. Themethod is to measure vertical deflection deformation of beam with the hydrostatic leveling monitoringmeter, monitor pre-stressed reinforcement with anchor monitoring, and measure concrete strain;reinforcing bar meter measuring reinforcement force with surface strain meter. Through analyzing theresults, this method can be taken to make real-time monitor on the safety status of the pre-stressedconcrete, and judge the beam healthy condition.
出处 《石家庄铁路职业技术学院学报》 2017年第4期65-68,共4页 Journal of Shijiazhuang Institute of Railway Technology
关键词 预应力混凝土结构 现场监测 健康状况 锚索应力 pre-stressed concrete structure field monitoring health status anchor stress
  • 相关文献

参考文献1

二级参考文献4

共引文献47

同被引文献8

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部