期刊文献+

泵闸工程BIM协同建模与抽图研究 被引量:2

Research on BIM Collaboration Modeling and Drawing Composition
原文传递
导出
摘要 模型是BIM技术的载体。水利工程BIM流程的标准化是模型在二维设计方案的空间、信息多维度延伸的基础上,高效完成综合交付的重要一环。以泵闸工程为BIM实践案例,采用三维协同技术,提出以专业分工为基础,以并行作业为条件,以地理位置为总装空间的协同建模流程。通过比较传统二维制图和三维协同抽图在效率、准确性、综合性、可修改程度等方面的差异,提出泵闸工程BIM协同建模的优势及可进一步优化的措施。说明采用BIM协同建模和抽图在泵闸工程设计中具有较高推广应用的技术价值。 A model is a carrier of BIM technology. The standardization of BIM processes with Water Engineering is an important part of the integrated and efficient delivery when the model is based on the two-dimensional design space and the multi-dimensional extension of information. In the case of Pump and Sluice BIM practice, the paper adopts the three-dimensional collaborative technology, and puts forward the collaborative modeling process based on professional division of labor, the parallel operation as the condition and the geographical location as the general assembly space. By comparing the differences of efficiency, accuracy, comprehensiveness and modification degree between traditional two-dimensional drawing and three-dimensional collaborative drawing composition, the advantages of BIM collaborative modeling in Pump and Sluice engineering and the measures to be further optimized are put forward. The technical value of BIM collaborative modeling and drawing composition in the design of Pump and Sluice engineering has high popularization and Application
作者 卓鹏飞
出处 《上海水务》 2017年第4期39-41,共3页 Shanghai Water
关键词 泵闸工程设计 BIM流程 协同建模 并行作业 pump and sluice engineering design BIM process collaborative modeling parallel operation.
  • 相关文献

参考文献6

二级参考文献38

  • 1Mohamed Nour,Karl Beucke.An Open Platform for Processing IFC Model Versions[J].Tsinghua Science and Technology,2008,13(S1):126-131. 被引量:5
  • 2尹习双,周宜红,胡志根,刘全,丁世来,李仕奇.基于虚拟现实的水电工程施工动态可视化仿真研究[J].系统仿真学报,2005,17(7):1690-1693. 被引量:33
  • 3邓雪原,张之勇,刘西拉.基于IFC标准的建筑结构模型的自动生成[J].土木工程学报,2007,40(2):6-12. 被引量:68
  • 4Kerzner H. Project management: a system approach to planning, scheduling, and controiling [ M ]. New Jersey : John Wiley & Sons, 2006:2-7.
  • 5The American Institute of Architects. Intergrated project delivery: a guide [ M ]. USA: The American Institute of Architects, 2007.
  • 6Moore C, Mosley D, Slagle M. Partnering guidelines for win-win project management [ J ]. Project Management Journal, 1992,22 ( 1 ) : 18-21.
  • 7友恪劳.希尔建筑信息公司.建筑信息模型-设计与施工的革新,生产与效率的提升[R].美国:麦格劳-希尔建筑信息公司,2010.
  • 8Harvey R, Bahgat T. Gerbe D, et al. BIM as a risk management platform enabling integrated practice and delivery [ M 1. Manitoba. Canada: Matrix Group Publishing, 2009.
  • 9Nour M. Performance of different (BIM/IFC) exchange formats within private collaborative workspace for collaborative work [ J ]. Journal of Information Technology in Construction, Special Issue Building Information Modeling Applications, Challenges and Future Directions, 2009,14:736- 752.
  • 10Flager F, Welle B, Bansal P, et al. Multidisciplinary process integration and design optimization of a classroom building [ J ]. Journal of Information Technology in Construction, 2009,14:595-612.

共引文献331

同被引文献10

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部