摘要 随着国家对大气污染物排放控制要求的提高,除了对新建机组在设计时应考虑外,对现役的燃煤机组在原设计时执行的烟气污染物控制排放标准不能满足现有国家的环保要求的均需要技术改造。神华集团、国华电力公司更是提出了严于国家环保要求的标准对徐州电厂进行技术改造,其中脱硫改造后SO_2排放浓度≤20 mg/Nm^3。 With the stricter air pollutants emission limits in china, in addition to the new unit should be considered in the design, emission standards can not meet the needs of all the technical transformation of existing national environmental protection requirements of the control of flue gas pollutants in coal-fired units active in the implementation of the original design.Shenhua Group, Guohua Power Company is put forward strict requirements of national environmental protection standard of Xuzhou power plant for technological transformation, the desulphurization emission concentration of SO, is less than or equal to 20 mg/Nm~.
出处 《电力勘测设计》 2017年第6期23-28,共6页 Electric Power Survey & Design
关键词 高品质发电 超净脱硫除尘一体化技术 SO2排放浓度 high quality power generation integrated technology of ultra clean desulfurization and dust removal SO~ emission concentration.
  • 相关文献

参考文献3

二级参考文献8

共引文献44

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部