结合沁水龙港选煤厂总平面设计实例,从工业场地选址、总平面设计过程、妥善处理近远期关系三方面分析探讨了如何节约建设用地的问题,提出具体的节约用地措施。
Combined with the general layout design example of Qinshui Longgang Coal Preparation Plant,this paper made analysis and discussion on how to save the land for constructions from the three aspects of the site selection of industrial site,general layout design process and making the best of the short and long term relationship and put forward specific measures to save land.
出处
《能源与节能》
2017年第12期89-90,共2页
Energy and Energy Conservation
关键词
选煤厂总图布置
合理布局
节约用地
general layout of coal preparation plant
rational layout