摘要 连续刚构桥的合龙是其施工控制的关键,在实际施工中,由于现场的种种因素而改变合龙方式,将对施工监控工作带来较大的影响。文章以2座大跨径连续刚构桥为例,分析了改变合龙方式对挠度和应力的影响,提出相关建议,为该类桥梁的施工及监控量测工作提供参考。 Closure of the continuous rigid structural bridge is critical in construction control. In construction,the closure mode has to be changed because of restriction of site factors. This change largely impacts the construction control and monitoring . Two continuous rigid structural bridges with large spans are exemplified in the paper to analyze impacts on deflection and stress by the closure mode change. Accordingly,comments are provided so as to be referred to construction control and monitoring of similar bridges.
作者 屈博
出处 《西北水电》 2017年第6期62-65,共4页 Northwest Hydropower
关键词 桥梁工程 连续刚构桥 合龙 施工控制 bridge work continuous rigid structural bridge closure construction control
  • 相关文献

参考文献5

二级参考文献20

共引文献50

同被引文献12

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部