介绍了浦东铁路一期工程市郊列车的运营现状,对浦东铁路一期客流特征和客流需求进行了分析和预测,提出了浦东铁路一期工程市郊列车运营方案。计算了浦东铁路一期工程线路平行运行图的通过能力,并对其配套方案进行了分析,最后探讨了浦东铁路一期工程扩大市郊列车开行数量的可能性。
The operating conditions of Pudong Railway on the 1st phase are introduced,characters and demands of passenger flow of Pudong Railway are analyzed and predicted, the operation scheme for suburban railways in Pudong Area is proposed. Then, the carrying capacity of the parallel train diagram of Pudong Railway is calculated, the matching program of which is analyzed. Finally, the possibility of increasing the number of suburban trains on the 1st phase of Pudong Railway is discussed.