摘要
厦门环岛路明挖隧道底板防水采用空铺法、侧墙与顶板防水采用湿铺法进行施工,同时从结构耐久性与使用安全性考虑,节点部位添加两道附加防水层,以保证隧道达到预期防水效果。本文介绍了该防水工程项目的设计与施工工艺。
Loose laid is used for floor of open cut tunnel of Xiamen Island Road and wet laid is applied for side walls and floor. In terms of structure durability and use safety, two additional waterproofing layers are applied for details to ensure the tunnel achieve the desired waterproofing effect. This article introduces design and construction process of this waterproofing project.
出处
《中国建筑防水》
2018年第1期38-40,共3页
China Building Waterproofing
关键词
明挖隧道
节点密封
空铺法
湿铺法
套管式穿墙管
变形缝
open cut tunnel
detail sealing
loose laid
wet laid
bushing through wall tube
deformation seam