摘要
核电厂建造和调试阶段异物控制不当,将对核电厂后续的安全稳定运行构成极大的威胁,文章对近期国内核电厂调试过程发现的几起典型异物事件进行原因分析和经验反馈,提出了防异物的管理思路,包括建立健全防异物管理体系、提高人员防异物意识和责任心、实施严格的防异物控制措施、有效管理防异物失效风险等。
Improper control of foreign material during nuclear power plant construction and commissioning phase will cause a big threat to the safe and stable operation of NPP.Several recent typical foreign material events of domestic nuclear power plants were analyzed and performed experience feedback.The management including establishing thinking of foreign material exclusion was put forward, and perfecting foreign material exclusion management system, improving personnel awareness and sense of responsibility to foreign material exclusion, conducting strictly foreign material exclusion controlling, effective managing the risk of foreign material exclusion failure, etc.
出处
《企业技术开发》
2017年第12期37-39,72,共4页
Technological Development of Enterprise
关键词
核电厂
调试过程
防异物
经验反馈
nuclear power plant
commissioning process
foreign material exclusion
experience feedback