期刊文献+

多方合同型IPD模式AIA合同文本研究 被引量:2

A Study of AIA Standard Form Based on Multi-Party Agreement for Integrated Project Delivery
下载PDF
导出
摘要 IPD模式按照集成程度从低到高分为过渡型、多方合同型和单一实体型(SPE型),相对而言多方合同型IPD模式应用较广。美国建筑师协会(AIA)颁布的C191合同属于多方合同型IPD模式标准合同文本,是IPD模式规范化应用的基础,可以作为IPD模式在中国应用的重要参考。通过系统梳理多方合同型IPD模式的合同结构,对合同文本进行深入挖掘,整理归纳业主、设计单位、承包商在项目各阶段的工作内容,对激励报酬、风险分配和争议处理等具体合同条款进行分析,为中国情景下采用多方合同型IPD模式提供借鉴。 According to the level of integration,IPD(integrated project delivery)can be divided into three modes:transitional mode,multi-party agreement mode, and single purpose entity(SPE)model,among which the second one is widely used. the C191, which is a multi-party agreement and issued by the American Institute of Architects(AIA),is a standard contract for the standardized application of IPD. By conducting an in-depth investigation of the structure of multi-party agreement mode and AIA C191 contract,this paper summarizes phase-based tasks for the owner,the architect, and the contractor. Besides,this study also analyzes the incentive,risk assignment,and dispute settlement,which provides important implications for the development of IPD in China.
出处 《工程管理学报》 2017年第6期1-5,共5页 Journal of Engineering Management
基金 国家自然科学基金面上项目(71571137)
关键词 IPD模式 多方合同型 AIA C191合同 合同文本 integrated project delivery multi-party agreement AIA C 191 contract contract conditions
  • 相关文献

参考文献4

二级参考文献30

  • 1Lichting W.A., The Integrated A- greement for Lean Project Delivery [J], Contract Forms/Project Management, 2006, 26(3):25-32.
  • 2Zhang Y., Guangbin W.. Cooperation between Building Information Modeling and Integrated Project Delivery Method Leads to Paradigm ShiR of AEC Industry [J], Management and Service Science, 2009:1-4.
  • 3Kenig M., Allison M., Black B. et al. Integrated project delivery for public and private owners [EB/OL], www.agc. org/projectdelivery, 2010-09.
  • 4Novitski B.J.. New AIA agreement support integrated project delivery [EB/OL], http://archrecord.construction. com/practice/proj Delivery/0807aia.asp, 2008-07.
  • 5David A., Vashali A.. IPD: The AIADelivers a Multi-Party Agreement [EB/OL], http://www.zdlaw.corn/enews/2010/integrated-proj ect-delivery-ipd.php, 2010-02.
  • 6PatrickJ. O'Connol; Jr, Integratedproject delivery, collaboration through new contract forms[EB/OL], http://www.acecmn.rg/contents/file/194,2009-01 - 15.
  • 7Feniosky Pena-Mora, Michael Li. Dynamic planning and control methodology for design/build fast-track construction projects [ J ]. Journal of Construction Engineering and Management, 2001, 127 (1): 1-17.
  • 8George Elvin. Integrated practice in architecture: Mastering design-build, fast- track, and building information modeling [M]. New Jersey: John Wiley and Sons, 2007.
  • 9AIA Nation/AIA California Council. Integrated project delivery: a guide [M/OL]. Washington: The American Institute of Architects, 2007 [2010-10-30]. http: //www. betterbricks. com/ graphics/assets/documents/AIA-_ IPD_ Guide 2007. pdf.
  • 10David C Kent, Burcin Becerik-Gerber. Understanding construction industry experience and attitudes toward integrated project delivery [ J ]. Journal of Construction Engineering and Management, 2010, 136 (8): 815-825.

共引文献55

同被引文献14

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部