软土区域超深基坑连接段施工关键技术 被引量:7

Key Technology of the Connection Construction of Ultra-deep Foundation Excavation Engineering in Soft Soil District
下载PDF
导出
摘要 在软土区域,为控制基坑变形、确保基坑安全,超大超深基坑多采用分坑分段施工。此类基坑在两端先行完成,最后施工中间的连接段区域。在进行连接段施工时,如何妥善解决支撑、开挖、拆撑及结构对接施工是重难点问题,这对施工技术和管理提出了较高要求,结合南京某深基坑工程的实际情况,分析总结了软土区域超深群基坑连接段施工的多项关键技术。 In soft soil area, in order to ensure safety of the ultra-deep foundation excavation, method of separate excavation and section construction was adopted to avoid the adverse deformation. In such kind of foundation excavation, both ends were advanced finished, and the middle connection district was constructed at last. During the connection construction, it seemed a hard and important problem to deal with the support-layout, excavation, support-removal and structure-connection. So higher demands were proposed for construction technology and management. Combined with the actual operation of some deep foundation excavation in Nanjing, multiple key technologies were eventually analyzed and summarized.
作者 陈刚 邢澄
出处 《施工技术》 CAS 2018年第1期15-18,23,共5页 Construction Technology
基金 南京金融城项目(2013024268)
关键词 深基坑 软土 连接段 换撑 施工技术 deep foundation excavation soft soil connection section support replacement construction
  • 相关文献

参考文献4

二级参考文献19

共引文献44

同被引文献42

引证文献7

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部