期刊文献+

某重钢工业厂房吊车检测鉴定与加固方案分析 被引量:2

Analysis of Inspection and Reinforcement of Crane in a Heavy Steel Workshop
下载PDF
导出
摘要 厂房吊车梁轨道变形、翘曲,行车运行时吊车梁晃动增大,行车大车运行车轮啃轨严重。为确保该厂房安全生产使用,需测量吊车梁垂直偏斜、同一截面跨度、中心直线度、挠度及吊车梁的整体稳定性核算等,并根据当前现状提出加固方案。 The crane girder of the running, the crane beam sway increases, In order to of the same ensure the safe production section, the central stra of the crane beam was calculated. At a factory is deformed and warped seriously. When the vehicle is and the wheel of the cart is seriously damaged by running wheels. of the workshop, the vertical deflection of the crane beam, the span htness, and the deflection were measured and the overall stability st, according to current situation, the reinforcement scheme was put forward.
作者 刘忠辉
出处 《工程质量》 2018年第1期70-72,90,共4页 Construction Quality
关键词 排架结构 吊车梁 翘曲 整体稳定 加固 bent structure crane girder warp overall stability reinforcement
  • 相关文献

参考文献1

共引文献3

同被引文献11

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部