摘要
东江引水工程从立项到实施一直缺失对利益影响方的补偿资料及研究,且目前国内外尚无同类电站大规模引水案例可资借鉴。本文结合东江水电站的运行现状及东江引水工程的引水规模,分析其遭遇的不利影响和潜在损失;针对湖南电网结构和所损失电能质量,按同质电能替换补偿方式列出补偿计算公式。
Compensation data and research of affected persons of Dongjiang diversion project is absent, and there is no similar large-scale diversion cases for reference which conduct water from a hydro-power station with peak and frequency modulation. Combining the current operation situation of Dongjiang hydro-power station and the scale of Dongjiang diversion project , the paper analyzes the adverse effects and potential losses. Aiming at the structure and loss of power quality of hunan power grid, the paper puts forward the homogeneous compensation formula.
出处
《湖南电力》
2017年第6期25-28,共4页
Hunan Electric Power
关键词
东江水电站
引水工程
不利影响
补偿研究
Dongjiang Hydropower Station
diversion project
adverse effect
compensation research