期刊文献+

3000t/d硫化矿选厂设计与生产实践 被引量:2

Design and production practice of 3000t/d sulfide ore dressing plant
下载PDF
导出
摘要 介绍了3 000t/d硫化矿选厂处理的原矿性质、建设条件、主要建设方案及现场管理措施。设计采用了SABC磨矿系统和DCS系统对选矿生产全过程自动化控制。结合选厂生产实践完善了顽石均匀给料、粗碎给矿改造和锌浮选流程优化等,通过现场管理措施,各项技经指标均超过设计值。 The ore properties, construction conditions, construction schemes, management system of the 3 000t/d sulfide ore dressing plant were introduced, In the design SABC grinding system was used and the DCS system was used to control the whole production process automatically. Based on the production experience, the feeding system of hard rock and the coarse crushing were further perfected, and the zinc flotation process was optimized. The technical and economic indexes of the plant exceeded the design value by using these management measures.
出处 《中国矿山工程》 2017年第6期21-25,共5页 China Mine Engineering
关键词 选矿厂 改造方案 SABC磨矿系统 ore dressing plant transformation scheme SABC grinding system
  • 相关文献

参考文献4

二级参考文献3

共引文献40

同被引文献88

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部