摘要
大准铁路是西煤东运的重要运输通道之一,随着大准线点—九段增二线改建工程的投用和准池铁路的接入,大准铁路煤炭运量逐年递增,运量市场发生变化。通过阐述大准铁路运输能力现状,在分析大准铁路煤炭运量的基础上,对大准铁路九苏木—天成段、天成—丹洲营段、丹洲营—十九沟段、十九沟—燕庄段的区段能力进行测算,研究提出相应的对策分析。
Dazhun Railway is one of the important corridors to transport coals from the western part of China to the eastern regions. With the operation of its Zenger Line Yijiu Section and the connection with Zhunchi Railway, the coal capacity of the railway is increasing year by year, and the volume market is changing. Based on current transport capacity and coal transport volume of Dazhun Railway, this paper calculates the capacity in different sections on this railway, including Jiusumu- Tiancheng Section, Tiancheng-Danzhouying Section, Danzhouying-Shijiugou Section, and Shijiugou- Yanzhuang Section, and proposes relevant solutions accordingly.
出处
《铁道运输与经济》
北大核心
2017年第B12期40-45,52,共7页
Railway Transport and Economy
基金
中国神华能源公司科技创新项目(SHGF-16-51)
关键词
大准铁路
运输能力
煤炭运量
单线区段
运输能力
对策
Dazhun Railway
Transport Capacity
Coal Transport Volume
Single Track Section
Transport Capacity
Solutions