系杆拱桥吊杆更换数值模拟与方案优化 被引量:14

Numerical Simulation and Working Procedure Optimization of Suspender Replacement of Tied Arch Bridge
下载PDF
导出
摘要 以某下承式钢管混凝土系杆拱桥为工程背景,首先创建了全桥的有限元三维模型,计算了实际待更换吊杆损伤对结构性能的影响。其次,确定了吊杆更换方案和吊杆张拉步长,基于临时吊杆法,详细模拟了吊杆更换的整个过程,分析了在此过程中系杆和拱肋位置吊点的位移变化及吊杆索力变化。最后,将等步长与不等步长两类更换旧吊杆的施工方式进行了对比研究。研究结果表明:吊杆失效对失效位置处桥梁的节点位移,内力和弯矩值都有较为显著影响。设计合理的吊杆更换方案和选择适当的张拉步长能使更换过程高效稳定地进行。采用等步长与不等步长更换都能使吊杆更换平稳地进行,不等步长方案相对更为安全。 Taken a concrete-filled steel-tabular tied-arch bridge as the research object,the finite element three-dimensional model of bridge are established firstly and the influence of the actual failure of suspenders which are need replaced on the bridge performance are analyzed. Then,the procedure and stretch step size of suspender replacement are determined. The process of suspender replacement according to the temporary suspender method is simulated numerically in detail and the displacement change of the tied bar and the arch rib,as well as the cable force change of the suspender during the suspender replacement process are analyzed. Finally,two kinds of suspender replacement method respectively with equal step size and variable step size are compared. The research results show that the failure of suspenders has significant effects on the nodal displacement, internal force and bending moment of the bridge. Reasonable procedure and stretch step size of suspender replacement can ensure the efficiency and steady of suspender replacement construction. Suspender replacement can proceeded steadily with equal step size and variable step size methods,and the variable step size method is more safe.
出处 《公路工程》 北大核心 2017年第6期48-53,63,共7页 Highway Engineering
基金 国家自然科学基金(51308293) 江苏省交通运输科技项目(2015T48) 江苏省大学生创新创业训练计划(201718013A)
关键词 系杆拱桥 吊杆更换 张拉步长 索力优化 tied arch bridges suspender replacement stretch step size cable force optimization
  • 相关文献

参考文献4

二级参考文献19

共引文献19

同被引文献64

引证文献14

二级引证文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部