超限高层施工过程模拟及竖向构件预找平分析处理 被引量:5

Construction process simulation of super high-rise building and analysis and processing of vertical components’ pre-leveling
原文传递
导出
摘要 以陕西省延长石油科研中心大厦超限高层项目为工程背景,基于施工阶段叠加法的分析原理,同时考虑混凝土材料收缩徐变特性、混凝土核心筒配筋率的影响以及伸臂桁架延迟连接措施,运用MIDAS/Gen软件对该项目进行施工过程模拟,计算分析塔楼竣工时刻结构的竖向变形和次结构(如伸臂桁架)的附加应力,并通过简单的理论公式推导得出结构竖向构件预找平计算方法,在此基础上,求出结构竖向构件预找平值,为施工方确定构件下料长度提供参考,弥补构件变形,尽可能使结构在竣工后满足设计要求。 Based on the super high-rise building of Yanchang Petroleum Scientific Research Center located in Shaanxi Province,software MIDAS/Gen was used to conduct the construction process simulation on the project based on the construction stage superposition method,considering shrinkage and creep of concrete,reinforcement ratio of the concrete corewall and measures that delaying connection of outriggers. The vertical deformation of the tower at the moment of completion and the additional stress of the secondary structure( such as the outriggers) were calculated and analyzed.Simple theoretical formula was used to derive pre-leveling calculation method of vertical components. On this basis,pre-leveling value of the vertical structural component was calculated,which provide references for the construction party to determine the component blanking length to make up for the deformation of the component and to make the structure meet the design requirements after completion as far as possible.
出处 《建筑结构》 CSCD 北大核心 2018年第1期26-31,共6页 Building Structure
关键词 施工阶段叠加法 收缩徐变 附加应力 延迟连接 预找平 construction stage superposition method shrinkage and creep additional stress delay connection pre-leveling
  • 相关文献

参考文献2

二级参考文献38

  • 1冯长根.2003年我国事故与灾害状况综述[J].安全与环境学报,2005,5(1):1-8. 被引量:50
  • 2王湛.钢管膨胀混凝土的徐变[J].哈尔滨建筑工程学院学报,1994,27(3):14-17. 被引量:17
  • 3朱明程,刘西拉.多层砖混建筑的连续倒塌分析[J].四川建筑科学研究,1994,20(2):2-5. 被引量:6
  • 4李建君.撞桥事故分析及对策[J].中国水运,1995(3):32-33. 被引量:8
  • 5谭素杰 齐加连.长期荷载对钢管混凝土受压构件强度影响的实验研究[J].哈尔滨建筑工程学院学报,1987,(2):10-24.
  • 6Wang Y Y, Geng Y, Ranzi G, et al. Time-dependent behaviour of expansive concrete-filled steel tubular columns[J]. Journal of Constructional Steel Research, 2011, 67(3): 471-483.
  • 7Uy B. Static long-term effects in short concrete-filled steel box columns under sustained loading [J]. ACI Structural Journal, 2001, 98 (1) : 96-104.
  • 8Goel R, Kumar R, Paul D K. Comparative study of various creep and shrinkage prediction models for concrete[J]. Journal of Materials in Civil Engineering,2007, 19(3) : 249-260,.
  • 9Gilbert R I, Ranzi G. Time-Dependent Behaviour of Concrete Structures [M]. UK: Spon Press, 2011.
  • 10Terrey P J, Bradford M A, Gilbert R I. Creep and shrinkage of concrete in concrete-filled circular steel tubes [C]//Proc of 6th Inter Symposium on Tubular Structures. Melbourne, Australia, 1994: 293-298.

共引文献36

同被引文献39

引证文献5

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部