6HEEMSKERK C J M.The use of heuristics in assembly sequence planning[J].CIRP Annals-Manufacturing Technology,1989,38(1):37-40.
7LIT P D,LATINNE P,REKIEK B,et al.Assembly planning with an ordering genetic algorithm[J].International Journal of Production Research,2001,39(16):3623-3640.
8ANANTHA R,KRAMER G A,CRAWFORD R H.Assembly modeling by geometric constraint satisfaction[J].Computer-Aided Design,1996,29(9):707-722.
9TRAN P,GREWAL S.A data model for an assembly planning software system[J].Computer Integrated Manufacturing Systems,1997,10(4):267-275.
10TSENG H E,LI J D,CHANG Y H.Connector-based approach to assembly planning using a genetic algorithm[J].International Journal of Production Research,2004,42(11):2243-2261.