摘要 通过监测数据分析论述港珠澳大桥岛隧工程沉管隧道自2013年5月—2017年10月整个施工期的运行状况,监测内容包括沉降、差异沉降、管节纵向结构挠度、管节接头张合量、节段接头张合量、节段接头水压以及隧道整体情况。结果表明,沉管管节实际差异沉降得到较好的控制,复合地基+组合基床使得沉降得到改善,隧道整体运行情况与结构反应良好,整体与接头基本没有渗漏水情况。 Through monitoring data, we analyzed the operational conditions of the immersed tunnel of Hongkong -Zhuhai-Macao island and tunnel project in the whole construction period since May 2013 to Oct. 2017. The monitored informationincludes settlement and differential settlement, element longitudinal deflection, element joint opening and closing, segmentedjoint opening and closing, segmented joint water pressure, and the overall condition of the tunnel. The results show that theactual differential settlement of the immersed tunnel section is well controlled. The composite foundation and the combinedfoundation bed make the settlement improved. The overall operation of the tunnel is in good response with the structure, andthere is no leakage of water at the whole and the joint.
作者 林鸣 林巍 李哈汀 王晓东 LIN Ming;LIN Wei;LI Ha-ting;WANG Xiao-dong(China Communications Construction Co., Ltd., Beijing 100088, China;CCCC Highway Consultant Co., Ltd., Beijing 100088,Chin;CCCC Tianjin Port Engineering Institute Co., Ltd., Tianjin 300222, China;No.2 Engineering Co., Ltd. of CCCCFourth Harbor Engineering Co., Ltd., Guangzhou, Guangdong 510300, China)
出处 《中国港湾建设》 2018年第1期1-6,共6页 China Harbour Engineering
关键词 港珠澳大桥 运行情况 沉管隧道 沉降 防水 Hongkong-Zhuhai-Macao Bridge operational condition immersed tunnel settlement water tightness
  • 相关文献

参考文献4

二级参考文献20

  • 1龚昊,盛克苏.沉管隧道健康监测研究[J].长江大学学报(自科版)(上旬),2006,3(2):91-94. 被引量:6
  • 2JTJ298-98.防波堤设计与施工规范[S].[S].,..
  • 3陈绍章.沉管隧道设计与施工[M].北京:科技出版社,2002.
  • 4JAN SAVEUR. Hazard Analysis[J]. Tunneling and Underground Space Technology, 1997,12(2) : 135-144.
  • 5OLE DAMGAARD LARSEN. Ship Collision with Bridges the In- teraction between Vessel Traffic and Bridge Structures[M]. Switzer- land: IABSE- AIPC - IVBH, 1993.
  • 6ORESUNDSBRO KONSORTIET. The tunnel[M]. Denmark: The Oresund publication, 2011.
  • 7園田恵一郎沈埋函トンネル技術マニュアル(改訂版)[M].日本:財団法人沿岸開発技術研究センター,2002.
  • 8JOHN G. HOUSLEY. Coastal Engineering Manual[M]. U.S. Army Corps of Engineers, 2002.
  • 9J G BERRY. Guidelines for the Design of Armored Slopes under Open Piled Quay Walls[M]. Belgium: PIANC General Secretariat, 1997.
  • 10徐峰,孟光,彭海阔,丁麒.沉管隧道健康监测试验中传感器位置的优选[J].振动与冲击,2008,27(2):87-90. 被引量:5

共引文献35

同被引文献55

引证文献11

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部