摘要
胶东调水输水明渠建成通水运行后,出现渠道渗漏水、衬砌板鼓胀破坏、伸缩缝挤压拱起等影响工程正常运行的问题,本文对工程出现的几类主要问题的原因进行分析,阐述了不同的工程处理措施。实践证明:这些处理措施保证了工程的长期良好运行,对同类明渠工程管理运行具有借鉴意义。
After Jiaodong water diversion channel is constructed and operated, the following problems are discovered:channel water seepage, lining plate expansion damage, expansion joint extrusion heaving, etc. affecting normal operatithe project. In the paper , problems of several main problems in the project are ana ly zed, and different engineeringtreatment measures are described, practice shows that these treatment measures can ensure long-term sound operation of theproject, and have reference significance for similar channel project management operation.
出处
《水利建设与管理》
2018年第1期90-92,共3页
Water Conservancy Construction and Management
关键词
问题
原因分析
处理措施
problem( cause ana ly s is ( treatment measures